International Journal of Mechanical and Production Engineering (IJMPE)
.
Follow Us On :
current issues
Volume-12,Issue-2  ( Feb, 2024 )
Past issues
  1. Volume-12,Issue-1  ( Jan, 2024 )
  2. Volume-11,Issue-12  ( Dec, 2023 )
  3. Volume-11,Issue-11  ( Nov, 2023 )
  4. Volume-11,Issue-10  ( Oct, 2023 )
  5. Volume-11,Issue-9  ( Sep, 2023 )
  6. Volume-11,Issue-8  ( Aug, 2023 )
  7. Volume-11,Issue-7  ( Jul, 2023 )
  8. Volume-11,Issue-6  ( Jun, 2023 )
  9. Volume-11,Issue-5  ( May, 2023 )
  10. Volume-11,Issue-4  ( Apr, 2023 )

Statistics report
May. 2024
Submitted Papers : 80
Accepted Papers : 10
Rejected Papers : 70
Acc. Perc : 12%
Issue Published : 131
Paper Published : 2390
No. of Authors : 6806
   
Total Viewed
 
Download Citation    
Download Citation    
 
1
Cost- Benefit Analysis Of Two Dissimilar Warm Standby Space Shuttle System Subject To Failure Due To Damage Of The Thermal Protection System Of The Shuttle’s Wing And Failure Due To Atmospheric Hot Gas With Switch Failure
Ashok Kumar Saini
 
Page 15-19
| Quick Abstract | PDF |
Viewed - 68
 

2
Cost-Benefit Analysis Of Two- Identical Cold Standby System Subject To Solar Penal Failure And Failure Due To Effects Of Shading And Angle The Panels Are Mounted
Ashok Kumar Saini
 
Page 20-23
| Quick Abstract | PDF |
Viewed - 68
 

3
Benefit-Function Of Two- Identical Cold Standby Space Station System Subject To Failure Due To Damaged Starboard Solar Alpha Rotary Joint Or Failure Due To Excessive Vibration During Reboost
Ashok Kumar Saini
 
Page 26-31
| Quick Abstract | PDF |
Viewed - 49
 

4
Benefit-Function Of Two- Identical Cold Standby Satellite System Subject To Launch Failure Or Failure Due To Collision
Ashok Kumar Saini
 
Page 33-38
| Quick Abstract | PDF |
Viewed - 98
 

5
Cost-Benefit Analysis Of Two Similar Warm Standby Satellite Systems Subject To Failure Of Fbtp Due To: (A) Gripping At One Of The Seal Locations And Seizure Of Rotor And (B) Rupture Of Turbine Casing Caused Probably Due To Excessive Pressure Rise And Thermal Stresses
Ashok Kumar Saini
 
Page 34-38
| Quick Abstract | PDF |
Viewed - 63
 

6
Cost-Benefit Analysis Of Two-Unit Cold Standby Solar System Subject To Non-Availability Of Sunlight And Human Error
Ashok Kumar Saini
 
Page 38-41
| Quick Abstract | PDF |
Viewed - 67
 

7
Benefit-Function Of Two- Identical Cold Standby Navy Ship Subject Failure Due To Fire-Fighting Systems Or Communications, Electrical Systems And Forward Propulsion Plagued By Flawed Designs
Ashok Kumar Saini
 
Page 42-48
| Quick Abstract | PDF |
Viewed - 49
 

8
Profit-Function of Two- Identical Cold Standby System Subject to Failure Due to Parachute Malfunctions Caused the Crash and Failure Due to Breathing Ventilation Valve Had Ruptured, Asphyxiating the Cosmonauts with Erlang-K Repair Time Distribution
Ashok Kumar Saini
 
Page 43-46
| Quick Abstract | PDF |
Viewed - 19
 

9
Cost-Function Of Two-Dissimilar Cold Standby Units Under The Influence Of Electrical Fluctuations And Human Errors
Ashok Kumar Saini
 
Page 46-49
| Quick Abstract | PDF |
Viewed - 7
 

10
Profit Function Of A Two-Non Identical Cold Standby System Subject To Fog With Switch Failure And Repair Facility As First Come Last Serve
Ashok Kumar Saini
 
Page 63-66
| Quick Abstract | PDF |
Viewed - 45
 

11
Cost-Benefit Analysis Of Two Similar Warm Standby System Subject To Failure Of Banks And ATM Due To Internet Connectivity Failure
Ashok Kumar Saini
 
Page 65-68
| Quick Abstract | PDF |
Viewed - 51
 

12
Profit-function of two similar warm standby navy ship system subject to failure due to ageing ships in need of maintenance, delayed acquisitions by the ministry of defence, and human error.
Ashok Kumar Saini
 
Page 70-75
| Quick Abstract | PDF |
Viewed - 11
 

13
Benefit-Function Of Two- Identical Cold Standby Communication Satellite System Subject To Failure Due To Inclement Weather Or Failure Due To The Unfavorable Weather Conditions (High Altitude Winds)
Ashok Kumar Saini
 
Page 74-78
| Quick Abstract | PDF |
Viewed - 49
 

14
Profit- Function Of Two-Unit Dissimilar Cold Standby System With Erlang-K Failure Time Distribution Subject To Fluctuations In Temperatures
Ashok Kumar Saini
 
Page 77-79
| Quick Abstract | PDF |
Viewed - 46
 

15
Profit-Function of Two- Identical Cold Standby System Subject to Failure Due to Parachute Malfunctions Caused the Crash and Failure Due to Breathing Ventilation Valve Had Ruptured, Asphyxiating the Cosmonauts With Erlang-K Repair Time Distribution
Ashok Kumar Saini
 
Page 102-105
| Quick Abstract | PDF |
Viewed - 25
 

   
   
IRAJ Other Journals
IJMPE updates
Volume-12,Issue-2 (Feb, 2024 )
The Conference World

JOURNAL SUPPORTED BY